WhatsApp +86 15338888949

Order-specific pricing

Flexible Stone Price Guide

Updated

Flexible stone prices depend on the selected finish, sheet format, quantity and delivery scope. Send these details for a comparable wholesale quote; request samples first if the finish is undecided.

Flexible stone sheet shown bent to demonstrate its form
Six samples with different colours and textures and lifted edges
Record the finish and sample reference for each line item. Look names describe the surface of composite flexible stone; they do not identify a quarried natural-stone sheet.

Browse flexible stone series

What shapes the price?

FactorWhat the buyer providesKeep consistent when comparing
Series & finishSeries name and reference imageSame finish and sample reference
Size & thicknessSheet format and cut planSame format and thickness requirements
Quantity & mixArea for each finishSame total and finish proportions
CustomizationSpecial colour, texture or sizeSame development scope
Packing & labellingHandling and project-area needsSame packing and labels
Destination & freightDestination and delivery requirementsSeparate material and freight when needed

Size and thickness information · Customization scope · Packing and destination requirements

Takeaway: compare matching inputs before comparing quotes. Common mistake: comparing a material-only price with one that includes different packing or freight.

Separate the quantity for each finish

Send the net wall area for each finish, then confirm the order quantity after reviewing the sheet layout. Keep cutting allowance and spare sheets separate from net area so suppliers quote the same quantities.

Hypothetical 6 metre by 3 metre wall split into 12 and 6 square metre finish areas
Area arithmetic only. This does not show panel sizes, joints or a cutting plan.

Formula: rectangular wall area = width × height. Assume a wall without openings: 6 m × 3 m = 18 m²; finish A: 12 m² and finish B: 6 m². Total: 18 m² before cutting allowance or spares. Deduct measured openings where present; do not assume a fixed waste percentage.

Review sizes and thickness for the selected product; confirm format, thickness and sheets per pack with the quote.

Compare material, delivered and installed costs

Compare flexible stone quotes on the same delivery basis. Record currency, pricing unit, quantity, inclusions and quote validity before ranking prices. If an Incoterms rule is used, record the agreed rule, edition and named place.

Nested cost scopes: material inside delivery scope, inside wall preparation and installation scope
Scope diagram, not cost proportions. Check which items each quote includes.
Comparison scopeItems to confirmDominant failure mode & prevention
MaterialFinish, format, quantity per finish, customization and packingDifferent quantities or finishes hide the price difference; send the same schedule to each supplier.
DeliveredFreight, insurance, clearance, duties, taxes and local delivery, as agreedAssuming freight includes destination charges; request explicit inclusions and exclusions.
Installed wallSubstrate preparation, adhesive, edges, joints, labour, access, spares and careBudgeting for sheets alone; have the installer price the site scope.

Budget formula: total wall cost = material + packing + logistics and import costs + site preparation and installation + spare and care allowances. Add only items not already included elsewhere. Obtain actual amounts from the supplier, freight agent and installer; this guide sets no rates or savings percentages.

Comparison rule: if any finish, quantity or delivery scope differs, request a revised quote before comparing totals. For exterior use, confirm project approval of the wall system before committing the budget.

Plan packing and shipping · Review the sample-to-supply process

How to get a comparable quote

Send the collection name or a reference image, approximate area, number of finishes, application and destination. If the specification is not fixed, we start with samples and state the assumptions instead of publishing a fixed number that does not represent the order.

The project quote request page lists what to attach, from drawings to destination.

Project questions

Why is there no universal unit price?+

The quote depends on finish, format, quantity, customization, packing and delivery requirements. A fixed figure would not describe every order.

How should I list quantities for several finishes?+

List the area for each finish and the total so the number of finishes and their share can be reviewed together.

Can material and freight be shown separately?+

Yes, material and freight can be separated when a clear comparison is required. Include the destination and packing requirements.

What to send us

Scroll the table horizontally to see all columns.

ItemWhy we need itExample format
Finish or product referenceIdentify the sample or product to quoteProduct link or reference photo
Format and quantityMatch the requested product and order scopeProduct reference, sheet size and quantity list
Wall area and applicationDefine the project scopeDimensioned drawing and wall photos
DestinationDiscuss packing and shippingCity and country or port

We reply within 24 hours.

Send your project details

Method and sources

Updated October 2026. This guide uses our published quotation inputs and packing and shipping process. The numerical example is an assumed quantity schedule; selected-product data and costs are confirmed in the project quote.

ICC: Incoterms and commercial contracts, accessed 18 October 2026, explains the allocation of transport costs, risks and customs responsibilities. The quote must identify the agreed rule and edition.