Order-specific pricing
Flexible Stone Price Guide
Updated
Flexible stone prices depend on the selected finish, sheet format, quantity and delivery scope. Send these details for a comparable wholesale quote; request samples first if the finish is undecided.


What shapes the price?
| Factor | What the buyer provides | Keep consistent when comparing |
|---|---|---|
| Series & finish | Series name and reference image | Same finish and sample reference |
| Size & thickness | Sheet format and cut plan | Same format and thickness requirements |
| Quantity & mix | Area for each finish | Same total and finish proportions |
| Customization | Special colour, texture or size | Same development scope |
| Packing & labelling | Handling and project-area needs | Same packing and labels |
| Destination & freight | Destination and delivery requirements | Separate material and freight when needed |
Size and thickness information · Customization scope · Packing and destination requirements
Takeaway: compare matching inputs before comparing quotes. Common mistake: comparing a material-only price with one that includes different packing or freight.
Separate the quantity for each finish
Send the net wall area for each finish, then confirm the order quantity after reviewing the sheet layout. Keep cutting allowance and spare sheets separate from net area so suppliers quote the same quantities.
Formula: rectangular wall area = width × height. Assume a wall without openings: 6 m × 3 m = 18 m²; finish A: 12 m² and finish B: 6 m². Total: 18 m² before cutting allowance or spares. Deduct measured openings where present; do not assume a fixed waste percentage.
Review sizes and thickness for the selected product; confirm format, thickness and sheets per pack with the quote.
Compare material, delivered and installed costs
Compare flexible stone quotes on the same delivery basis. Record currency, pricing unit, quantity, inclusions and quote validity before ranking prices. If an Incoterms rule is used, record the agreed rule, edition and named place.
| Comparison scope | Items to confirm | Dominant failure mode & prevention |
|---|---|---|
| Material | Finish, format, quantity per finish, customization and packing | Different quantities or finishes hide the price difference; send the same schedule to each supplier. |
| Delivered | Freight, insurance, clearance, duties, taxes and local delivery, as agreed | Assuming freight includes destination charges; request explicit inclusions and exclusions. |
| Installed wall | Substrate preparation, adhesive, edges, joints, labour, access, spares and care | Budgeting for sheets alone; have the installer price the site scope. |
Budget formula: total wall cost = material + packing + logistics and import costs + site preparation and installation + spare and care allowances. Add only items not already included elsewhere. Obtain actual amounts from the supplier, freight agent and installer; this guide sets no rates or savings percentages.
Comparison rule: if any finish, quantity or delivery scope differs, request a revised quote before comparing totals. For exterior use, confirm project approval of the wall system before committing the budget.
Plan packing and shipping · Review the sample-to-supply process
How to get a comparable quote
Send the collection name or a reference image, approximate area, number of finishes, application and destination. If the specification is not fixed, we start with samples and state the assumptions instead of publishing a fixed number that does not represent the order.
The project quote request page lists what to attach, from drawings to destination.
Project questions
Why is there no universal unit price?+
The quote depends on finish, format, quantity, customization, packing and delivery requirements. A fixed figure would not describe every order.
How should I list quantities for several finishes?+
List the area for each finish and the total so the number of finishes and their share can be reviewed together.
Can material and freight be shown separately?+
Yes, material and freight can be separated when a clear comparison is required. Include the destination and packing requirements.
What to send us
Scroll the table horizontally to see all columns.
| Item | Why we need it | Example format |
|---|---|---|
| Finish or product reference | Identify the sample or product to quote | Product link or reference photo |
| Format and quantity | Match the requested product and order scope | Product reference, sheet size and quantity list |
| Wall area and application | Define the project scope | Dimensioned drawing and wall photos |
| Destination | Discuss packing and shipping | City and country or port |
We reply within 24 hours.
Send your project detailsMethod and sources
Updated October 2026. This guide uses our published quotation inputs and packing and shipping process. The numerical example is an assumed quantity schedule; selected-product data and costs are confirmed in the project quote.
ICC: Incoterms and commercial contracts, accessed 18 October 2026, explains the allocation of transport costs, risks and customs responsibilities. The quote must identify the agreed rule and edition.